image

Abdelrahem Awad Abdelrahman Mahgoub

Last login: 2 years ago

Mechatronic Engineer

Skills and tools

Team Work
Flexibility
communication skills
Microsoft applications
Excel
and Outlook.
Problem solving
Commitment

Contact Abdelrahem Awad Abdelrahman Mahgoub

Terms & Conditions Terms and Conditions

About me

Mechatronic Engineer / Project Engineer, investing my time onenhancing machinal and electrical applied Knowledge, with serious concern aboutenergy utilization and keen interest in financial management. 

Education

Bachelor degree in Mechatronic Engineering
UCSI University (Malaysia)

Work Experience

March 2019 -July 2021
Projects Engineer
Bash Pharma Co. Ltd

We are aiming to construct new Automatic pharmaceutical injectable line. And  may 

responsibilities are: 

1. Electrical and Mechanical site preparation for Project’s activities.

2. HVAC System installation for new injectable line considering the pharmaceutical industry standards.

3. Power modification to integrate the new line in the factory and to ensure consistent and safe power supply for the factory.

4. Clean rooms installation.

6. Injectables line equipment installation.

7. Project management (using Primavera), which includes identifying critical activities and selecting proper schedule compression methods to handover the project on time and within the predetermined budget.  

February 2018 -April 2018
Intern Project Engineer
Sharjah National Oil Corporation (SNOC)

I was assigned to Liquefied Petroleum Gas (LPG) Blending facility and truck loading project, my duties included:

1. Ensuring project execution is proceeding according the following documents:

1.1. Project Contract, design basis and system architecture.

1.2. Project execution procedure and scope of work.

1.3. Operation manual and work permit system.

1.4. PLCs and instruments designs.

1.5. Pipe line tie-ins schematics.

2. Documenting following procedures and meetings:

2.1. Hot tapping of methane pipe line.

2.2. Pipe lines hydro tests.

2.3. PLCs installation and attaching them to the field instruments through their marshaling cabinets and PLC Loop checking.

2.4. Switch gear modification and commissioning

2.5. Distribution transformer Commissioning.

2.6. Installing for natural gas transfer pumps.

2.7. Weekly progress meeting.

2.8. Pre-Commissioning and commissioning meetings

July 2021 -Currently working
Project Engineer
Liliam Pharmaceutical Industries Company Limited

  Constructing a pharmaceutical plant that contains nine production lines with a productive power of two hundred products of  Solid dosage forms, Semisolids, Injections and Eye drops. 

Awards and Certificates

June 2018 -August 2018
Automotive
Salesian Institute "Donbosco" , 3 months , (160 hours)

This vocational  course was concerned about cars , I have learned the proper methods to disassemble, maintain  and assemble car Systems such as: Petrol and diesel engines, Engine external and enteral parts, Fuel System, Cooling System and ignition System, Exhaust System. Clutch System, Transmission system,Differential Suspension Systems Steering Systems Brake Systems. furthermore,I Was also trained in cars electrical systems.

June 2018 -September 2018
Control By Contactors
Salesian Institute "Donbosco" , Three Months , (90 hours)

The course was about : 

1. Constructionand maintenance of magnetic contactors andrelays.

2. Constructingclassic control systems based on a givendesign. 

3. Designingand constructing power and controlcircuits.

4. Constructionand maintenance ofTimers.

5. Designing,Constructing and securing power and control circuit of three phasemotors.

November 2018 -December 2018
CNC Turning
Salesian Institute "Donbosco" , Two Months , (72 hours)

I was trainned on EMCO CNC turning machine , the course included : 

1.  CNC Machine preparation, configuration and safety.

2.  G & M Coding.

3.  CNC Tools, tools dimensions and tools compensation.

4.  Manufacturing parts according to given designs with differentthreading, cutting and drilling specification and precise finishing using EMCOPC Turn 155 CNC lathe.

August 2018 -October 2018
Siemens PLC S7 - 200
Salesian Institute "Donbosco" , Two Months , (48 hours)

1. Performancefeatures of the SIMATICS7-200.

2.  ExpansionpossibilitiesandaddressassignmentontheS7-200.

3. Structuring,creating and starting up programs for control tasks with the SIMATIC S7-200 Projectstructure of the SIMATICS7-200.

4. Using STEP7 Micro/WIN programming tools for program creation, documentation, communication andtroubleshooting.

5.  MainoperationssuchasNumbersystems,datatypesandmemoryareas.

6. Troubleshoot hardware and softwareerrors.

December 2018 -January 2019
CNC Milling
EPSILON Company Training Centre Two months

1.  CNCManufacturing Concepts and tools selection.

2.   CNCMilling operations (face milling, planar milling, cavity milling, drilling andthreading) using Siemens NX7.5 manufacturing – CNC Mill-46100.

3.  Toolpath Information output visualization (ISV).

March 2021 -March 2024
Project Management Professional (PMP)
Project Management Institute (PMI)

Candidates Reviews:

Uploading