image

Abdel Magied Mahmoud

Last login: 1 second ago

Engineering Manager

Skills and tools

Management
Team Management
patience
Flexibility

Contact Abdel Magied Mahmoud

Terms & Conditions Terms and Conditions

Education

September 1993 -August 1998
Bsc
Faculty of Engineering

Work Experience

January 2017 -Currently working
Engineering &Projects Manager
Al Dawlya For Paper Converting

 Design Amaintenance plan for company2-    Design aspare parts stock and plan3-   Sizing New Machines and facilities equipment4-   Supervision on new construction projects5-   Coordinate with the production departments andother departments and receive complaints and coordination with them toestablish priorities and the order of operations maintenance procedures.6-   Overseeing on implementation of the contracts ofmaintenance outsourcing companies and put periodic maintenance plans for themand prepare the related reports and performance, efficiency evaluation.7-   Prepare the annual budget of the department ofmaintenance preparation and make recommendations on ways to reduce costs andmake the most of the machinery and equipment available to take advantage.8-   Do other tasks related to work requirements andupon requests of the direct manager after the adoption of head department. 

November 2016 -January 2017
Engineering &Projects Manager
Scib chemicals

1-     Design and develop annual ,monthly plans and maintenance outsourcing process, the routine Maintenance andthe company facility and equipment plans and ensure their implementation,supervising on implementation determine the extent of their quality and theirimpact on production to development and improvement all maintenance processes. 2-     Overseeing on the periodic checkson the equipment and tools, and coordinate with health and safety department toensure the application of health and safety conditions during theimplementation of maintenance operation. 3-     Review the balances of inventoryand make sure there is continuous coverage of tools and spare part6s in case offaults and to ensure the efficiency of this stock. 4-     Prepare and developing themaintenance processes of policies and procedures manual (Mechanical/electrical)and the training of management personnel on how to implement these procedures. 5-     Coordinate with the productiondepartments and other departments and receive complaints and coordination withthem to establish priorities and the order of operations maintenanceprocedures. 6-     Overseeing on implementation ofthe contracts of maintenance outsourcing companies and put periodic maintenanceplans for them and prepare the related reports and performance, efficiencyevaluation. 7-     Analysis and review all reportsrelated to indicators of performance in terms of maintenance operations. 8-     Prepare the annual budget of thedepartment of maintenance preparation and make recommendations on ways toreduce costs and make the most of the machinery and equipment available to takeadvantage. 9-     Manage and follow upimplementation the improvement plan for facility and projects in the finalstage and ensure that working with the efficiency. 10-  Ensure from all the maintenance staff follow all directions andprocedures existing in the procedures and instructions manual related to 5sstandards and security and iso and occupational health and safety. 11-  Do other tasks related to work requirements and upon requests ofthe direct manager after the adoption of head department. 

June 2014 -November 2016
Engineering &Projects Manager
Al-Ahly For Industry and Development

1.     Managing all Engineering Projectsof Company2.     Managing Maintenance Department

November 2013 -June 2014
Maintenance Manager
Egypac for corrugated cartoon boxes, MM Group

1.     Managing and monitoring the entiredepartments’ functions (maintenance, plant Engineering and maintenanceadministration). 2.     Implement and evaluate maintenanceannual plan for all machines and its applications and ensure its implementationfor a continuous and smooth plant operations.3.     Follow up on the implementation ofthe external maintenance contracts and ensuring that they are carried out asper the defined conditions and standards.4.     Implement the internal plant’sprojects and set plans and the required budgets in coordination with themaintenance manager5.     Performing all the requiredtechnical Engineering studies for the new Projects.6.     Study and discuss all the offeredtenders for the new projects. 7.     Studying and choosing newpackaging Machines. 8.     Supervision for the installationof production Lines9.     Preparing the annual maintenancebudget.10.  Design and supervising all the required Predictive andprotective maintenance Plans11.  Ensuring the availability of all spare parts required formachines with the needed Specifications and criteria.12.  Choosing, Sizing and maintaining all the Ancillary equipmentrequired for the processes I.e. chillers, boilers, compressors, generators,Air-conditions13.  Approving machines’ records and endorsing all the maintenanceand repair activities and the released spare parts.14.  Ensuring that all the departmental operations and activities arecarried out under the specifications and standards of the ISO 9001, 18001 andthe environmental system ISO15.  Managing the Engineering Maintenance staff16.  Managing the training procedures for the staff17.  Enforcing safety program for maintenance department18.  Direct Maintenance department in cost-effective manner19.  Manage spare parts stores20.  Manage staff of engineering purchasing21.  Apply with FMCG industry standards through packaging Engineering22.  Supervision for design and installation of fire fighting systems23.  Managing Maintenance of HVAC systems

July 2000 -November 2013
Maintenance & project Manager
Porta Egypt for packaging materials

Managing and monitoring the entire departments’functions (maintenance, plant Engineering and maintenance administration).         2-   Implement and evaluate maintenance annual plan forall machines and its applications and ensure its implementation for acontinuous and smooth plant operations.3-   Follow up on the implementation of the externalmaintenance e contracts and ensuring that they are carried out as per thedefined conditions and standards.4-   Implement the internal plant’s projects and set plansand the required budgets in coordination with the maintenance manager5-   Performingall the required technical Engineering studies for the new Projects.6-   Studyand discuss all the offered tenders for the new projects.                                          7-   Studyingand choosing new packaging Machines. (Printing, lamination, slitters …etc.)                                8-   Supervisionfor the installation of production Lines9-   Preparingthe annual maintenance budget for the two companies10-Designand supervising all the required Predictive and protective maintenance plans ensuring the availability of all spare parts required for machines withthe needed specifications and criteria.11-Choosing,Sizing and maintaining all the Ancillary equipment required for the processes i.e.chillers, boilers, compressors, generators, Air-conditions12-  Approving machines’ records and endorsing all themaintenance and repair activities and the released spare parts.13-  Ensuring that all the departmental operations andactivities are carried out under the specifications and standards of the ISO9001, 18001 and 14000.14-  Managing the Engineering Maintenance staff15-  Managing the training procedures for the staff16-  Enforcing safety program for maintenance department17-  Direct Maintenance department in cost-effective manner18-  Apply with FMCG industry standards through packaging Engineering

September 1998 -July 2000
Maintenance Engineer
Espack for Engineering Services

 1-Installation of newmachines at customer premises.2-After sale service

Awards and Certificates

September 1993 -August 1998
Bsc Of Mechanical Engineering
Faculty of Engineering Mansoura University 5

Candidates Reviews:

Uploading