image

Ali Taha Elagib Abuharira

Last login: 1 year ago

Field Operator

Skills and tools

Flexibility
Team Work
Microsoft applications including Word

Contact Ali Taha Elagib Abuharira

Terms & Conditions Terms and Conditions

About me

I have more than 10 years in oil and gas Operating Company.

familier to operate all production and utility facilities such as well head, OGM, Separators, dehydrator, heat exchanger, gas boot, produce water tank, skim oil tank, flare system, instrument air system and firefighting system.

Ihave good skill about microsoft office, PLC and HMI

Education

January 2000
diploma
Sudan University of science and Technology

Electronics Engineeer(Power Supply, AC & DC, Telecomunication, power Elecrtonics, Micro Controla, )

Work Experience

December 2017 -Currently working
Production Operator
2B Operating Company(2BOPCO) - SUDAN

<!--[if gte mso 10]> /* Style Definitions */ table.MsoNormalTable{mso-style-name:"Table Normal";mso-tstyle-rowband-size:0;mso-tstyle-colband-size:0;mso-style-noshow:yes;mso-style-priority:99;mso-style-parent:"";mso-padding-alt:0cm 5.4pt 0cm 5.4pt;mso-para-margin-top:0cm;mso-para-margin-right:0cm;mso-para-margin-bottom:10.0pt;mso-para-margin-left:0cm;line-height:115%;mso-pagination:widow-orphan;font-size:11.0pt;font-family:"Calibri","sans-serif";mso-ascii-font-family:Calibri;mso-ascii-theme-font:minor-latin;mso-hansi-font-family:Calibri;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:Arial;mso-bidi-theme-font:minor-bidi;}<![endif]-->

- Detects abnormal operatingconditions and reporting them to the superiors.

-Prepares the equipment for handover to Maintenance and then returning to service.

September 2015 -November 2017
Production Operator
Greater Nile Petroleum Company(GNPOC) - SUDAN

September 2005 -November 2012
Petrodar Operating Company(PDOC) - SOUTH SUDAN

Awards and Certificates

February 2006 -June 2006
Petroleum Technical Course
Khartoum University 4 months

History of oil, Oil Properties, Drilling, process Technology, production Management and HES.

July 2011 -August 2011
Oil Production Technology
Chaina University 7 Days

Production Methods, Oil Recovery Methods, Storage and Transportation.  

July 2011 -July 2011
Electrical submersible pump (ESP)
Schlumberger 1 Day

ESP Parts, ESP Installation, ESP Operation and Maintenance

October 2007 -October 2007
Progressive Cavity Pump (PCP)
Daqing Power Lift 2 Weeks

Candidates Reviews:

Uploading