Awad Mohammed Awad Mohammed
Sudanese
Muslim
Date ofbirth: 10/2/1983
Place ofbirth Khartoum_ Omdurman
Marital status: Married
Email: Awadabo83@hotmail.com
Contactaddress: +249912858648 _ +249923445122
+249111075876 _ +249916784840
Qualifications:
· Diploma in Petroleum Engineering (3 years) – SudanUniversity for science and Technology.
First Year : 2000/2001
Arabic Language & Islamic Culture
English Language
Mathematics 1
Engineering Drawing
Chemistry
Applied Physics
General Geology
Engineering Mechanics & Strength of Materials
Second Year : 2001/2002
Mathematics 2
Petroleum Production Technology 1
Petroleum Properties
Drilling Technology 1
Oil Reservoir Technology
Geophysics 1
Surveying
Third Year : 2002/2003
Petroleum Geology
Well Logging
Oil Secondary Recovery
Petroleum Economics
Safety and Security
Numerical Methods in Petroleum Engineering
Drilling Technology 2
Geophysics 2
Well Testing
Petroleum Production Technology 2
Computer Applications
Graduation Project
Field Operator FSF routine check for pumping wells and take recording for parameter also check VSD work normally and check local Gage & transmitter for temperature and pressure also check x tree and well head
If any failure of the well occurs or stops, we shall promptly resolve and inform the designated body to carry out its tasks.
I work in<!--[if gte mso 10]> /* Style Definitions */ table.MsoNormalTable{mso-style-name:"Table Normal";mso-tstyle-rowband-size:0;mso-tstyle-colband-size:0;mso-style-noshow:yes;mso-style-priority:99;mso-style-qformat:yes;mso-style-parent:"";mso-padding-alt:0in 5.4pt 0in 5.4pt;mso-para-margin:0in;mso-para-margin-bottom:.0001pt;mso-pagination:widow-orphan;font-size:10.0pt;font-family:"Times New Roman","serif";}<![endif]-->This unit is made up of a caterpillar machine and a compressor, and its mechanism is gas pressure, drying and injection into wells. This process is called industrial lifting and from my tasks of operating or stopping the unit and following up the screen that contains the pressure and temperature and read other and other tasks also analyze faults and help the maintenance team to reach the cause of the failure
We studied the components of treatment plants, how to operate them, avoid malfunctions and find solutions