image

Aymen Elzubier

Last login: 2 years ago

Electrical Engineer

Skills and tools

Management
Team Work
Analytical skills
Microsoft applications

Contact Aymen Elzubier

Terms & Conditions Terms and Conditions

About me

Electrical Engineer with 15-year experience in area of Energy, Projects Management, Construction Supervision and Facilities Management.
Having interpersonal skills, can deal with all projects' stakeholders and performing well in competitive environment. Manage customer's Project to ensure contract fulfillment including scope, schedule and cost baselines.
Solid background in EPCC Turnkey projects management.
Wide technical and managerial experience on scope of Energy, Industrial and Commercial Projects.

Education

November 2001 -September 2006
Bachelor of Science in Electrical Engineering
University of Khartoum

Work Experience

October 2019 -Currently working
Director of Engineering
Corinthia Hotel Khartoum

-Responsiblefor the short and long-term planning and day-to-day operations in order tomaintaining the entire complex facility including physical building structure,all mechanical, electrical, special systems, HVAC systems, Fire FightingSystem, Water Treatment system and other related equipment.
-Develop, recommend, implement and manage the Preserves good relationship withsubordinates, vendor, contractor and specialized company for assistingmaintenance.
-Lead and support the Engineering Department in the training and development ofthe team in line with the priorities of the business, ensuring that allcolleagues have the necessary skills to perform their duties at an exceptionallevel.
-Handle any problems/complaints that arise and report back to the GeneralManager.
-Responsible for the activities with the relevant Executives and HODs
-Responsible for the department's budget capital expenditure plan, forecastsand objectives consistent with maintaining a first-class property andmanagement's expectations.
-Improve the engineering systems, in order to work at the maximum efficiencyand minimize cost.
-Develop, implement and manage the maintenance program and negotiatemaintenance contract, technical service and subcontractor for the hotel.
-Manage orders with foreign suppliers, payments, organizing and monitoring dispatch,shipment and custom clearance.
-Coordinate activities of extraordinary maintenance and resolution throughtechnical specialist, organization of technical missions on site.
-Delegate tasks and conduct performance appraisals in coordination with the AssistantChief Engineer.
-Motivate employees and facilitate teamwork.
-Conduct regular briefing and meeting within the department to discuss and passrelevant information concerning engineering.

October 2015 -May 2019
Electrical Project Engineer
Saudi Engineering Group International

-Workwith key stakeholders to identify project Scope of Work and TechnicalSpecifications.

-DevelopProject's base lines (Scope, Schedule and Cost).

-Manageand Review the Project Scheduling Processes such as Scope Decomposition,Activities Duration etc.

-Manageand Control Project Communications among Identified Stakeholders as percommunication Plan.

-Monitorand Control Project Progress Performance.

-Monitorand Control Project's Overlapping Phases (Design, Civil and MEP, Procurement,Installation, Testing and Commissioning and Project Closing).

-ClientRepresentative during project life cycle from project initiation up to closingphase that include but not limited to Design Review, Scope Change, QualityIssues, Safety and Progress Meetings.

-Followup with site Team regarding construction and commissioning activities andissues.

-Controlproject's Invoices and Confirm that all claims are as per validated scope.

-Ensurethat project files, reports and records are updated and properly maintained.

April 2014 -October 2015
Electrical Engineer MEP
DAL Design and construction

-Implement, commission, and maintain electrical installation work focusing onsafety, reliability, quality and sustainability to ensure installations andoperations are aligned with adopted standards.

-Ensurethat the health and safety requirements are fully complied

-Prepareworkshop drawings based on technical calculations, standards and codes ofpractice.
- Prepare exact BOQ based on approved workshop drawings and specification.

-Estimate, prepare and assign resources such as manpower, material, consumables,tools and equipment required to all electrical works prior execution.

-Sitesupervision of Electrical activities.

-Coordinateon-site MEP work.

-Conduct testing and commissioning as per approved procedures and vendersrecommendations.
- Report the actual MEP scope progress.

May 2013 -April 2014
Maintenance superintendent assistant
Petro Energy E and P LTD

-Operation and maintenance of all MV and LV system (OHTL,Transformers, DG sets and switchgears).

-Follow the preventive and corrective maintenance programs andkeep record of all the inspections done.
-Insure that maintenance contractors are following contracts and agreements.

-Support the contractors to achieve the target jobs bycoordination between different departments.

-Make required technical measurement for work acceptance report.

-Manage and Control status of operational spare parts.

-Follow all facilities MEP activities (installation andmaintenance).

December 2009 -May 2013
Operation Engineer
Merowe Dam Electricity Company Ltd

-Performall operation activities to ensure optimum operation for the power plant(1250MW).

-Mangethe operation shift team to keep the plant on health condition and preventmajor faults.
-Daily check and inspection for generation unites and all BOP systems.

-Performall required operations on HV/EHV GIS and AIS as per national grid controlcenter.

-Performall necessary operations and troubleshooting for the MV/LV switchgears, AC/DCUPS systems, power transformers, auto transformers and stand by DG sets.
-Perform the daily troubleshooting, change over, mechanical and electricalisolation to achieve scheduled preventive maintenance.

-Issuing,following up and closing work permits according to the operation and safetyprocedures.

-Coordinateswith the dispatch center all necessary procedures to achieve system stabilityand availability.

-Coordinatewith maintenance and planning departments all necessary procedures to performthe corrective and preventive maintenance.

May 2008 -November 2009
Electrical Engineer
Heglieg Petroleum Services and Investment Company

-Installation,testing and commissioning of electrical systems.

-Prepareprogress reports and following the planed progress schedules plans.

-Assurethat all construction activities are as per approved inspection and test plans.

-Materialreceiving inspection and issuing all inspection and testing reports forconstruction activities.
-Prepare all documents required for mechanical completion and professionalacceptance certificates.

Awards and Certificates

Project Management Professional
Project Management Institute

Candidates Reviews:

Uploading