image

Khalid Ali Alkhedir Ebrahim

Last login: 1 second ago

Skills and tools

Microsoft applications
Excel
Management
Problem solving

Contact Khalid Ali Alkhedir Ebrahim

Terms & Conditions Terms and Conditions

About me

Mechanical engineer with more than 4 years of experience working for international organizations in construction projects of oil and gas fields as Mech. QA QC Engineer. My experience has equipped me with skillset combined with, project management skills, material inspection, welding inspection skills, problems solving skills, site supervision skills, Document controlling skills, MS software skills, handling and implementing of international codes skill. Confidently experienced in developing ITP and Method statements as well as following the Quality Management system.

Education

October 2009 -October 2015
Mechanical Engineering
Sudan University of Science and Technology

Work Experience

December 2015 -September 2016
Junior mechanical Engineer
Petroneeds Services International.co

Supervising mechanical construction team atsite.

·        Reporting daily progress to the constructionmanager.

September 2016 -October 2017
QA/QC intern
Centroid Technical Services

Inspecting Pipeline welding, fabrication, andtesting as per ASME 31.3, ASME 31.4, API 1104, ASME 31.8 codes.

·        Conducting WQT for site welders as per ASMESec. IX.

·        Flare Stack erection and assembly as per API521 & API 537.

·        Material receiving and Inspecting.

·        Testing of suspected valves as per API 598.

·        Established a commissioning clearance checklist to ensure the contractor’sreadiness for commissioning.

October 2017 -November 2019
Mechanical QA/QC Engineer
Exico Petroleum Services

Inspecting all constructionmechanical activities to comply withclientspecifications andcodes.

·        Reduced rejection rate ofwelding team by more than 80% by monitoring and tracking the most common defects ofwelders and eliminating theroot

Causes.

·        Reviewing P&ID and ISO drawing beforesubmission toPMC.

·        Established documentstracking system that helped to quicken the final documentation process and toclaim milestone payment faster thanbefore.

·        Reduced projects’ punch list items bysecuring them duringconstruction.

·        Acting construction manager for sixmonths.

November 2019 -April 2020
Oil & Gas Project Engineer
Triple Star Technical Maintenance

Attend client meetings andassist with determination of project requirements.

·       Drafting and issuance ofproject proposals, RFP’s, tenders, budgets, cash flows and preliminaryschedules.

·        Prepare project organization and communicationcharts.

·        Chair site meetings and distribute minutes toall project team members.

·        Track the progress and quality of work beingperformed by design disciplines/trades.

·        Use project scheduling and control tools tomonitor project plans, work hours, budgets and expenditures.

Candidates Reviews:

Uploading