I Possess goodCommunication Skills, trained in a civil engineering degree courses, I am wellmotivated, hardworking, personable and reliable, capable of working in a groupas well as an Individual and well organized and proficient with details. I haveGood Knowledge in Oil & Gas industrial construction and design, as: SafetyRules, Operation Procedures of Equipment, Quality assurance and control andStructural analysis and design. Knowledge of Business and Management Principles,Ability to maintain high accuracy levels and work quality standards,Self-starter with strong planning, presentation, communication, andinterpersonal skills, Creative and innovative, Analytical Thinking, Ability totake initiatives, Experience in managing people and Adaptability & Innovation.
Thank you
Primarily responsible for the successful completion of assignedprojects, meeting the company’s contractual obligations and the clients’requirements and expectations
Repeated responsibilities Vs. various projects :
Pre-constructionStage:
Follow andsupervise projects section’s engineers for the following:
· · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ·
Post-ConstructionStage:
Follow up withthe assigned staff for the following:
· · · · · · · · ·
Someprojects undertaken:
· · · · Several number of Fuel Service Station
Supervision of newcompany building 14 floors – design phasePrimarily responsible for the successful completion ofassigned projects, meeting the company’s contractual obligations and theclients’ requirements and expectations
Repeated responsibilities Vs. various projects :
Pre-constructionStage:
· · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ·
Post-ConstructionStage:
Follow up withthe assigned staff for the following:
· · · · · · · · ·
Someprojects undertaken:
· · · · Supervision of new company building 14 floors – design phase
Example ofprojects:
· · · · · Shegara Depot Warehouse-Designer
Several number ofFuel Service Station· · · · · · · · · · · · · · · · · · · · · · · · · · · · · Co-ordinationwith the Contractors to rectify the defects during the defects liability period
Project:
South Annajma Oil Field is located in the north-eastof Keyi Oil Field, approximately 22km away from Keyi Field ProductionFacilities (FPF) at south kordofan .The mission of this project was to transferthe crude oil from five wellheads within South Annajma Oil Field to an EarlyProduction Facilities (EPF) for removal of bulk water as well as furthertreatment to meet export specifications of maximum 0.5% BS&W and thenexport 10,000 BOPD approximately via 43km export pipeline to the existing lightcrude shipping tanks at Fula CPF of Petro-Energy Operating Company (Block 6).The combined sales oil of (Star Oil Company and Petro-Energy L/C) is transferredvia the Light Crude pipeline connected to the GNPOC pipeline· · · · ·
Project:
Sudan Academy for Administrative Sciences(SAAS) Tower is located at Khartoum, Aljamaa Avenue with total area of 3500m 2,the project comprised of the following:
o o o o o o Cafeteria 100m2 approx.
o Land escaping area.
· · · · · · · · · · · · · · · · · Project:
UPGRADE OF ELECTRICAL DISTRIBUTION SYSTEM AT FIVE (5)SOUTHERN AREA GAS OIL SEPARATION PLANTS (GOSP), SAUDI ARAMCO
LSPB project to upgrade existing electrical distributionsystems at five (5) GOSPs at Shedgum & Uthmaniyah areas. The existingobsolete electrical equipments and the existing van contained substation shallbe demolished and new substations shall be constructed at new locations as perSaudi Aramco standards.The project consists of procurement, installation,testing, pre-commissioning and commissioning of the following:
· · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ProjectDescription/ Responsibilities:
· · · · · · · · · · · · · · · · · Project:
UPGRADE OF ELECTRICAL DISTRIBUTION SYSTEM AT FIVE (5)SOUTHERN AREA GAS OIL SEPARATION PLANTS (GOSP), SAUDI ARAMCO
LSPB project to upgrade existing electrical distributionsystems at five (5) GOSPs at Shedgum & Uthmaniyah areas. The existingobsolete electrical equipments and the existing van contained substation shallbe demolished and new substations shall be constructed at new locations as perSaudi Aramco standards.The project consists of procurement, installation,testing, pre-commissioning and commissioning of the following:
· · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · HVAC systemfor all five (5) substations including all duct works & air intake stacksystem.
Re-route & extend existing perimeter fencing withtype -1 SSD fencing.Re-route & extend existing perimeter fencing withtype -1 SSD fencing.
· Primarilyresponsible for the successful completion of assigned construction activities
Projects:
Constructionof Telecommunications facilities- several telecom towers and 30 and60m height