Dear Sir/Madam,
I wish to apply forthe post of Safety Supervisor withattached my updated detail CV. I am Bachelor of Science and done a Diplomain safety management, successfully completed NEBOSH IGC, OSHA 30 hrs.Construction Safety & introduction to Occupational Safety Health & Administrationand IOSH (managing safely). I have More than 12 years ofexperiences in Safety Officer.
With my proven ability to manage and maintain the highest Safetystandards, I feel that I would be able to make a significantcontribution to your company's management team.
For the past 05 years I have been working with M/s. Larsen & Toubro Ltd., hydrocarbondivision. Currently I am working with 48” Crude Transit Line (Kuwait OilCompany major project in North Kuwait).I had also worked with TAKREER/ADNOCand Borouge 3, UAE.
With regards,
Mohammad Perwez Ansari
Mob # +965 60614996
NEBOSH IGC
IOSH, Managing Safely
OSHA 30 hrs.
Jobs hazards analysis & permit processing from differentwork activities.
· · · · · · · · · · · · · · ·
· · · · · · · Attended monthly Safety Meetings with staffs and implementedrequired changes in the existing safety procedure.
Jobs hazards analysis & permit processing from differentwork activities.
· · · · · · · · · · · · · · ·
· · · · · · · Attended monthly Safety Meetings with staffs and implementedrequired changes in the existing safety procedure.
Jobs hazards analysis & permit processing from differentwork activities.
· · · · · · · · · · · · · · ·
· · · · · · · Attended monthly Safety Meetings with staffs and implementedrequired changes in the existing safety procedure.
Jobs hazards analysis & permit processing from differentwork activities.
· · · · · · · · · · · · · Check the ELCB (Earth Leakage Circuit Breaker) & GFCI (GroundFault Circuit Interrupter) for electrical equipments.
Jobs hazards analysis & permit processing from differentwork activities.
· · · · · · · · · · · · · Check the ELCB (Earth Leakage Circuit Breaker) & GFCI (GroundFault Circuit Interrupter) for electrical equipments.
Jobs hazards analysis & permit processing from differentwork activities.
· · · · · · · · · · · · · Check the ELCB (Earth Leakage Circuit Breaker) & GFCI (GroundFault Circuit Interrupter) for electrical equipments.
NA