Vikas Vishwadev Sharma

Last login: 2 years ago

Power Plant Engineer

Skills and tools

Perseverance and motivation
Teamwork

Contact Vikas Vishwadev Sharma

Terms & Conditions Terms and Conditions

About me

Instrumental in coordinatingplant operations for the set up standards with accountability for strategicutilization & deployment of available resources to achieve organizationalobjectives

Hands-on experience in supervising projectsfrom beginning to end and ensuring that projects are completed within stipulatedtime

Soundknowledge of all legislative and statutory requirements applicable for Thermal and Gas Power Plantsv  Demonstrated abilities in training, supervising& monitoring personnel, assisting in planning & scheduling activities

Education

June 1996
B.E. ( Mechanical )
J.T. Mahajan COE, North Maharashtra University, India

First Class with Distinction

Work Experience

October 2011 -May 2022
Shift Charge Engineer
Alghanim International

AsShift Charge Engineer (Operations)

·        Prior involvement inlooking after operations of

o   Gas Turbine:                                         6 x 50MW, GE LM 6000-PC controlled by NETCON

o   GasCompressor:                                3x 40 MMSCF, Valerus make Reciprocating Compressors controlled by PLC Allen      

                                                                 Bradley

o   VapourCompressor Heat Pump:     2 x 5000 TR,Turbine Air System make controlled by PLC Allen Bradley

o   GasInsulated Switchyard:               275 KVoil filled H.T. Cables with 11/275 KV Generator Step Up Transformers




AtM/s Alghanim International Kuwait- 1300 MW Combined Cycle Power Plant (Jan’14-Nov’14)

AsShift Charge Engineer (Operations)

·        Remarkably looked afteroperations of:

o   SteamTurbine:                                   2 x 200 MW, Alstom makeCondensing Steam turbine

o   HRSG:                                                   5  x 50 TPH, Alstom make, Dual Fuel Dualpressure boiler

o   GasInsulated Switchyard:               275 KVXLPE H.T. Cables with 19/275 KV Generator Step Up transformers.


Nov’14 – Till Date: M/s Alghanim International, Kuwait as a ShiftCharge Engineer (Operations)

 

Project:                                                                520 MW CombinedCycle Power Plant

 

GasTurbine:                                                         2x 260 MW, Siemens V94.3A, Dual fuel, controlled by SPPA T 3000

Gas Compressor:                                                 3x 75000 m3/hr, ATLAS COPCO make Centrifugal Compressors controlled by PLC AllenBradley

DMPlant:                                                              100m3/cycle, Veolia make controlled by PLC Scada Siemens

GasInsulated Switchyard:                                 400 KV XLPE H.T.Cables with 22/400 KV Generator Step Up Transformers

 

Key Result Areas:

·        Shouldering the responsibility analysis,troubleshooting & managing technical problems without affecting plant equipment

·        Effectively looking after operations of itsvarious equipments

·        Stellar role in monthly report preparation& circulation

·        Significant in preparing pre-start up, start-up& shutdown check sheets and various other auxiliary equipment

·        Active participation & implementation viz.Issuance of Safe Work-Related Permits like Cold, Hot, Confined Space withutmost isolation

·         Prominent involvement in LFI’s& SOP’s preparations including plant emergency & black out procedures



May 2006 -October 2011
Manager
Reliance Industries Limited

As Manager (Operations)

·        Essayed a stellar role inlooking after operations of:

o   Gas:                                                      9x 30 MW, GE Frame 6 with MARK V Control System

o   SteamTurbine:                                   6 x 30 MW, GHH Borsig make, Extraction cum Condensing

o   HRSG:                                                   110 TPH, BHEL / THERMAX make, Single pressure boiler, Duel fuel fired

o   AuxBoiler:                                           9x 125 TPH, Thermax Make, Dual Fuel Fired

                                         

Roles:

·        Immense experience in Commissioningof GE Frame 6 Gas Turbines.

·        Active involvement inCommissioning of Natural Gas Fuel firing system in Gas Turbines.

·        Prior Involvement inCommissioning & Pre-Commissioning Activities of STG, HRSG, BFW pumps, PRDS& Deaerators like:

o   Lubeoil Flushing Loops and Procedure Preparation

o   ChemicalCleaning of BFW pumps, Deaerators & Steam headers

June 2005 -April 2006
Executive
United Phosphorous Limited

As Executive(Operations)

 

·        Proactively looked afteroperations of:

o   GasTurbine:                                        42MW, GE–LM6000-PA, controlled by NETCON 5000

o   SteamTurbine:                                   21MW, GE make with WOODWARD 505E Digital Governor

o   HRSG:                                                   50TPH, DELTAK make, Double pressure boiler

o   DMPlant:                                             10m3/cycle, ECOTEC make controlled by PLC GE FANUC

o   DGSet:                                                  1MW, 1250 KVA, CUMMINS make

o   VapourAbsorption Heat Pump:      2x1150 TR,THERMAX make controlled by PLC Allen Bradley

 

January 2005 -June 2005
Engineer
Nirma Limited

39.18 MW Cogeneration Thermal Power Plant (Jan’05–Jun’05)

As Engineer (Operations)

 

o   SteamTurbine:                                   2x 16.34 MW, TOYO DENKY make, Double Extraction Cum Condensing

1 x 6.5 MW, BHEL make,Single Extraction Cum Back Pressure

o    Boiler:                                                  3x 100 TPH, LENTGES, 105 Bar, 5050 C, CFBC boiler

 100 TPH, ISGEC JOHN THOMPSON, 105 Bar, 505 oC

September 2002 -December 2004
Mechanical Engineer
Saurashtra Chemicals Limited

M/s Saurashtra ChemicalsLtd, Porbandar (India) - 20 MWCogeneration Thermal Power Plant

Sept’02 – Dec’04)

AsMechanical Engineer (Operations)

 

o   SteamTurbine:                                   5MW, Escher Wyse (Zurich), Double Extraction Condensing

2 x 5 MW, TriveniEngg., Single Extraction Back Pressure

                                                                                5MW, SKODA Make, Single Extraction Condensing

 

o   Boiler:                                                   3x 40 TPH, WALTHER & CIE, 42 kg/cm2, 455 oC, Stokerfired.                                                                                                45 TPH, IJT, 30 kg/cm2,350 oC, two drum Spreader Stoker fired                                                                                            15TPH, Thermax, 42 kg/cm2, 422 0C, Two drum Spreader Stokerfired

30 TPH, SKODA Make, 30kg/cm2, 380 0C, AFBC

25 TPH, SKODA make, 30kg/cm2, 416 0C, AFBC

 

June 2001 -June 2002
Graduate Engineer Trainee
Tata Chemicals Limited

Worked in Power Plant maintenance