I have completed my 16 years of education and having relevant
experience of around 9 years in the field of Instrument and control.
Currently I am working as an Deputy manager Instrument & Control at 46 MW Coal Fired Captive Power Plant which includes
1x Siemens steam Turbine(SST-400) and Auxiliaries.
1x 46MW Siemens generator.
2x 110t/h CFB coal fired boiler and other BOPs.
Previously i have worked for 4 years at UCH-2 power plant (404MW) Combined Cycle Power Plant Pakistan as a Warranty Manager and Instrumentation and control Engineer which includes
Two (2) GE Gas Turbines(Frame PG9171E),
One(1)Steam Turbine(Fuji),
Two (2) Heat Recovery Steam Generators & associated Auxiliaries and Balance of Plant.
Also I have worked for 10 months as a Trainee Instrument Engineer at OGDCL (Oil and Gas development company limited)Pakistan.