image

MOHAMMED ALMOUSTAFA YAHYA JABIR HAMMD

Last login: 2 years ago

Electrical Engineer

Skills and tools

IT skills
Application development

Contact MOHAMMED ALMOUSTAFA YAHYA JABIR HAMMD

Terms & Conditions Terms and Conditions

About me

I have a Bachelor Degree in Electrical Engineering, with 9+ years experience in Power Systems Protection & Control, Automation , Generation Power Plant O&M, and Power Utility Engineering.

Currently, I am working as Electrical Engineer for Gulf Industrial Services Company as Power Systems Engineer.

Earlier, I have worked for Sudanese Hydro Power Generation & Renewable Energies Co.LTD in Merowe Dam Power Plant - ALSTOM (1250 MW) in Power Plant Operation & Maintenance Department.

Then we have completed one project of power plant and distribution network study (off-grid connection) with disturbances investigation and route cause analysis for major failures/blackouts for distribution network 33/11 KV as Power Systems Control & Protection Engineer during my work for EleCon Company for Electrical Services (Sudan). As the scope of work was to study, analyize with reports assessing power plants performance, and upgrade the protection relays coordination in distribution substations using Etap Software for one of our clients, after my work as a testing & commissioning engineer for El Saeed Co. For Industrial & Electro - technical Developed Projects LTD Co.

Recently, I have worked in Contracting and Construction as Electrical Engineer for Net Electro-mechanical Contracting Company and before for Etag General Contracting Company.

I am dependable, hardworking, good planner, and motivated individual.

Education

January 2007 -December 2012
Bachelor Degree in Electrical Engineering
Sudan University of Science & Technology

Power Systems, Control and Electronics.

Work Experience

-Currently working
Electrical Engineer
Net Electro-mechanical Contracting

Project: Corrective Maintenance and New Installation Of Power Distribution Network Equipments, Transformers, Cables & OHL in Al Dhafra Region.
Responsibilities:
Performing testing and commissioning for installed 33/11 KV & 11/0.45 KV Substations, Cables and RMUs.
Root cause Analysis for breakdown , trips and faults in power distribution network equipments.
Supervising 11 KV Cable Installation, from excavation to cables laying, backfilling and reinstatement work, Cable Jointing & Terminations.
Review project scope and material specifications and Protection for Transformers, Cables, OHL, RMUs.
Corrective Maintenance for Distribution Substations, Cables, and OHL.
Ensuring that all electrical site activities are conducted under controlled conditions as per Schemes drawings, Method Statements, Work Plan, and ADDC standards for electrical works and specifications.

July 2019 -July 2020
Site Electrical Engineer
Etag General Contracting

Project: Ain Al Fayda 33/11 KV Brick Built Primary Substation - 11 KV Cables Laying, Diverting and Package Units Cables Recovery.
Responsibilities:
Supervised 11 KV Cable Installation, from excavation to cables laying, backfilling and reinstatement work, Cable Jointing & Terminations.
Managed and Supervised Recovery Cables and TRMs of two temporary 11 KV Package Units till delivering to stores.
Generated/Reviewed material requisitions, submittals, and method statements to ensure the contract performance measures are met.
Ensured that all electrical site activities are conducted under controlled conditions as per Schemes drawings, Method Statements, Work Plan, and (AADC, ADEWA) standards for electrical works and specifications.
Attended meetings with client, consultants and other contractors.

July 2015 -August 2016
Protection Engineer
EleCon For Electrical Services Company

Project: Block 6 power generation, distribution networks, and 33 kV OHTL protection study
(Part 1: Protection Coordination Settings).                Balila West Kordofan, Sudan                                   

Responsibilities:
Root cause Analysis for breakdown , trips and generators failure in Power Plant (ROLLS-ROYCE and Wärtsilä) and Distribution Network.
Reviewed protection settings for Power Generation Units, 33/11 kV Transformers, OHTL and Distribution Substations.
Handled Risk Analysis and Production Impact Assessment before applying a complete Settings Upgrade for Protective Devices in Distribution Network substations using ETAP Software.
Contributed in the analysis and assessment of power system components in Generation Plant, Power Distribution Network and Oil Pump Stations by using measurements and data extracted from Protection Relays.
Performed root cause analysis and made recommendations to address local and system-wide implications under emergencies.
Prepared engineering documents such as Blackouts and Breakdowns Justification, Power Plant & Network Status Reports, and Performance Enhancements Recommendations.

Awards and Certificates

May 2021 -May 2022
AADC Competency Certificate
Al Ain Distribution Company One Year

Installation, Testing Commissioning Supervision for 33/11/0.4 KV Distribution Substations and Cables.

Candidates Reviews:

Uploading